Tags:
Towards integration of renewables to reach 100% penetration the TSSG are assisting in the analyses of the shift and emerging roles for grid players, such as TSOs, and DSOs, and looking at the feasibility of a grid architectures that includes 5G based ICT. This architecture has to be in line with the EU’s energy and climate policy, such as SET-Plan, and must consider future grid scenarios with 100% RES.
The TSSG are developing the corresponding ICT infrastructure requirements which will be required to transmit in a fast, reliably, and securely way the wide area field measurements and commands for voltage and frequency management control systems.
The TSSG are also hosting ICT infrastructure to support the field trial testbed of the ESB for the voltage control concepts in Ireland.
The project is 3 years in length (2016-2019 and there are 9 work-packages:
RE-SERVE will produce a framework for stabilising energy systems with up to 100% RES integration, expressed as
A number of deliverables have been released by the RE-SERVE project https://www.re-serve.eu/deliverables.html
The main ones with TSSG input are:
D1.1 Scenarios & architectures for 100 % RES and roles of sector actors
https://www.re-serve.eu/files/reserve/Content/Deliverables/D1.1.pdf
D1.2 Requirements placed on energy systems on transition to 100% RES
https://www.re-serve.eu/files/reserve/Content/Deliverables/D1.2.pdf
D1.3 Requirements placed on ICT for energy systems with up to 100% RES
https://www.re-serve.eu/files/reserve/Content/Deliverables/D1.3.pdf
D1.4 Use cases definition for research in Frequency and Voltage control
https://www.re-serve.eu/files/reserve/Content/Deliverables/D1.4.pdf
D1.5 Adaption of research concepts based on simulation, live ICT tests and field trial results, V1
https://www.re-serve.eu/files/reserve/Content/Deliverables/727481_reserve_D1.5.pdf
D3.1 Power electronic stability criteria for AC three phase systems
https://www.re-serve.eu/files/reserve/Content/Deliverables/D3.1.pdf
D3.2 Demand Response and DG control considering Voltage Control and Stabililty
https://www.re-serve.eu/files/reserve/Content/Deliverables/D3.2.pdf
D3.3 Power electronics System-level stability criteria
https://www.re-serve.eu/files/reserve/Content/Deliverables/727481_deliverable_D3.3.pdf
D3.4 Networkd impedance characterisation for active distribution networks
https://www.re-serve.eu/files/reserve/Content/Deliverables/727481_deliverable_D3.4.pdf
D3.5 Specification for an on-line system level monitoring system
https://www.re-serve.eu/files/reserve/Content/Deliverables/727481_deliverable_D3.5.pdf
D3.6 Report on Reqirements on scalable ICT to implement voltage control concepts, V1
https://www.re-serve.eu/files/reserve/Content/Deliverables/727481_deliverable_D3.6.pdf
D3.8 WP3 Drafting of Ancillary Services and Network codes definitions, V1
https://www.re-serve.eu/files/reserve/Content/Deliverables/727481_deliverable_D3.8.pdf
D4.1 Demonstration of prototype of Laboratory infrastructure
https://www.re-serve.eu/files/reserve/Content/Deliverables/D4.1.pdf
D4.2 Functionality of the releases of the real time solver V1
https://www.re-serve.eu/files/reserve/Content/Deliverables/D4.2.pdf
D4.3 Functionality of the releases of the real time solver V2
https://www.re-serve.eu/files/reserve/Content/Deliverables/727481_deliverable_D4.3.pdf
D4.4 First interconnection test of the nodes in pan-European simulation platform
https://www.re-serve.eu/files/reserve/Content/Deliverables/D4.4.pdf
D4.5 5G extended functionality development to support voltage and frequency control
https://www.re-serve.eu/files/reserve/Content/Deliverables/D4.5.pdf
D4.6 5G extended functionality integration and testing in pan-European Simulation Infrastructures
D5.1 Report on field trial of voltage control concepts in Ireland and validation of initial network codes and ancillary service definitions, V1
https://www.re-serve.eu/files/reserve/Content/Deliverables/D5.1.pdf
D5.2 Report on field trial of voltage control concepts in Ireland and validation of initial network codes and ancillary service definitions, V2
https://www.re-serve.eu/files/reserve/Content/Deliverables/727481_deliverable_D5.2.pdf
D5.4 Report on trial of frequency control in Laboratory and validation of initial network codes and ancillary service definitions, V1
https://www.re-serve.eu/files/reserve/Content/Deliverables/D5.4.pdf
D5.6 Report on the 100% renewable Irish Scenario, V2
https://www.re-serve.eu/files/reserve/Content/Deliverables/727481_reserve_D5.6.pdf
D5.8 Report on validation of ICT concepts using live 5G network, gateway and Pan-European infrastructure, V1
https://www.re-serve.eu/files/reserve/Content/Deliverables/727481_reserve_D5.8.pdf